In accordance with BS 5266, emergency lighting installations must be tested at regular intervals. The guidelines below detail the required tests and who should perform them. Monthly ‘Operational’ Test Annual ‘Full System’ Test Any lights that fail to illuminate or do not stay illuminated for the duration of the designated test duration need to be … Guidelines on Emergency Lighting Tests